- Version
- Download 880
- File Size 62.68 KB
- File Count 1
- Create Date December 30, 2020
- Last Updated December 30, 2020
The DuPont Experimental Station was purchasing old style air filters through a national contract. The low-cost air filters were ultimately costing the site in excessive air filter changes, energy cost, labor and waste.
Attached Files
File | Action |
---|---|
Case Study General Aire Systems-DuPont.pdf | Download |