The DuPont Experimental Station was purchasing old style air filters through a national contract. The low-cost air filters were ultimately costing the site in excessive air filter changes, energy cost, labor and waste.

WordPress database error: [Table 'generalairesystems.wp_ahm_user_download_counts' doesn't exist]
select download_count from wp_ahm_user_download_counts WHERE user = '44.192.54.67' and package_id = '3580'

[featured_image]
  • Version
  • Download 37
  • File Size 62.68 KB
  • File Count 1
  • Create Date December 30, 2020
  • Last Updated December 30, 2020

The DuPont Experimental Station was purchasing old style air filters through a national contract. The low-cost air filters were ultimately costing the site in excessive air filter changes, energy cost, labor and waste.

Attached Files

FileAction
Case Study General Aire Systems-DuPont.pdfDownload 
Posted in .

Leave a Reply